Concordia University Dorm

  • Location: Mequon, WI
  • Size of Project: 94,000 sq. ft.
  • Scope of Work Performed: Cold formed metal framing, metal studs & drywall
  • Project Duration: April 2013 – August 2013
  • Unique Challenges with the Project: Aggressive schedule
  • General Contractor: CG Schmidt