Children’s Hospital (5th Floor MACC Fund)

  • Location: Milwaukee, WI
  • Size of Project: 25,000 sq. ft.
  • Scope of Work Performed: Steel studs & drywall
  • Project Duration: 3 months
  • Unique Challenges with the Project: Compressed schedule
  • General Contractor: Boldt