Carthage Straz Center

  • Location: Carthage College, Kenosha, WI
  • Size of Project: 100,000 sq. ft.
  • Scope of Work Performed: Steel studs & drywall, cold formed metal stud framing
  • Project Duration: 15 months
  • Unique Challenges with the Project: Elliptical Planetarium Enclosure, multi-phase addition to an existing building
  • General Contractor: Riley Construction